So then, after Chris Grayling blocked the Department for Transport devolving Southeastern services to TfL let’s see what he has in store as consultation on the next franchise begins.

And crucially, as I’ll cover later, I think they’ve possibly badly under-estimated planned house building which could skew the entire basis of growth and service provision.

Service cuts?

Firstly, it seems they do want to cut connections on the Woolwich line from Charlton to Blackheath, Lewisham, Waterloo East, Charing Cross and also the easy change for Victoria at Lewisham.

The Bexleyheath line would possibly also only see trains to Cannon Street and not Charing Cross.

Cutting trains on the Woolwich line to Charing Cross relates back to the Thameslink consultation. Thameslink plans would see two trains per hour on the Woolwich line to Luton through central London replacing those to Charing Cross.

The consultation also foresaw cuts to off-peak Southeastern services from six at present to four an hour, even at places like Erith which is seeing 2,000 homes under construction in the vicinity and wouldn’t see Thameslink trains stopping.

Higher fares?

Cutting trains to Charing Cross would perhaps be tolerable and make sense for wider service reliability if Southeastern passengers could change from trains to tube and DLR and not pay £1.50 extra which they currently do whilst other commuters in London do not.

For example, cross the river and c2c passengers coming from Essex don’t pay this. Passengers in the west using Great Western to Paddington and changing to the tube don’t pay extra. But Southeastern passengers must pay £1.50 extra on every trip.

It’s unfair to cut trains unless Southeastern passengers pay the same as most of London when changing, as TfL were proposing before their takeover was blocked, and not have a south east London penalty slapped on top.

Another example of fare disparity is non zone 1 trips. Cross the river and you’ll pay £1.70 in the peak to travel from zone 6 to zone 2. Do it with Southeastern and its £4.20. You can see the extra Southeastern passengers pay by using this page.

The consultation makes the usual noise about Crossrail and Thameslink solving most ills in terms of capacity. Thameslink actually cuts the number of trains Cannon Street will be able to handle in peak times comes nowhere near much of SE London’s metro services.

It brings no net increase to the Greenwich line in terms of frequencies if other services are cut and possibly even no capacity upgrade if 10 carriage SE trains become 8 carriage Thameslink.

Crossrail will of course help the Woolwich line but for those elsewhere such as Hayes, Bexleyheath, and Sidcup lines it does little. Any speed advantage in reaching the City from Crossrail over Southeastern is negated, for those in say Bexleyheath, in the need to reach Abbey Wood by bus. What does it do for capacity at Kidbrooke, Eltham etc?

12 carriage services are needed far more widely. And that means more Southeastern metro trains. That’s the crux of it.

Here’s a survey you can fill out on the next franchise.

Housing

Even with Crossrail, the Greenwich line will be busy again by the early 2020s. Just look at these current housing numbers from KFH (the second column showing total properties):

Greenwich borough is ranked number two out of 33 London authorities under current schemes and the borough has the second highest target for new homes up to 2030 under the London Plan.

The document seems to badly underestimate planned housing numbers. It claims 36,000 new homes coming in the SE Metro area in London boroughs (thus excluding Dartford and Medway).

That’s just too low and seems a dated figure given recent changes. There’s 20,000 homes at least in Greenwich. 15,700 under Knight Dragon plans with many more at Enderby Wharf, Morden Wharf, River Gardens, Precision and those such as Greenwich Square near Maze Hill. That has 400 alone, and I covered it last week.

Vast numbers at Lewisham too as anyone passing would’ve seen.

Plans for retail park site by station

Deptford could see 5-10,000. Convoys Wharf alone is 3,500 and preliminary work begun last year. Large numbers also being built at the Creek as I covered two days ago when I took a walk round looking at the towers going up. The Timberyard development will see 1,132 homes. There’s also former school sites to be built on at Tidemill and the former Deptford Green site.

Charlton will see 8,000 at least with the riverside masterplan for 7,500 plus sites at Victoria Way and elsewhere.

Woolwich could see at least 10,000. A vast number of homes coming here. Just yesterday I covered new plans for another 800 more homes by Meyer Homes. There’s scope for many more.

Abbey Wood and Thamesmead’s housing zones total 3,000 homes and other developments will expand on that such as the proposed tower by Abbey Wood station. Again, much vacant land nearby.

Thamesmead plans commencing in months

Erith is seeing 2,000 homes planned now and more in future.

Town centre masterplan

Kidbrooke with 3,000+. Just last week TfL announced 400 homes there in addition to Kidbrooke Village, whose tower is now rising beside Kidbrooke station. It goes on and on.

Announced last week beside Kidbrooke station

Eltham also sees plans to build behind the High Street on car park sites.

You can double that 36,000 figure. The Department for Transport seem to be going with a very conservative number.

More trains?

There’s some mention of more stock but it seems vague to me, and also a few mentions of turning existing trains into tube like stock. I don’t have a problem with converting the rows of three seats into two throughout to make more space to stand but not keen on full tube like stock.

Combined working with Network Rail

This is Grayling’s big idea and the main reason he gave to block TfL (‘cos they can’t work with NR right on SE routes, like they do in many places?).

It will help, if it doesn’t fall apart as a previous scheme between South West Trains and Network Rail did after 18 months.

Passenger numbers

The consultation suggests that passenger numbers fell in 2015/16 from 2014/15. That’s not what GoVia’s own shareholder reports have said.

And if they are basing that as a guide for future demand it’d be unwise. Stations such as Abbey Wood have been closed pretty much every weekend for a couple of years due to Crossrail work.

Compensation

This is one of the good things with compensation attainable after 15 minutes delay instead of 30 minutes. This does though just bring it down to the same level as neighbouring Thameslink and Southern, and above c2c over the river which starts at just two minutes (and they pay less as noted above as they use TfL’s fare levels).

Capacity

They talk about capacity limits with trains running into London terminals being at capacity in the peaks. Very true. Cannon Street even sees a cut in the number of trains it can accommodate after Thameslink opens compared to 2014 as a connecting link to Charing Cross is cut. Trains were moved there to create more platform space for other trains to pull into. No longer possible.

So what do other networks do about this when capacity is reached on conventional lines? They use automated systems to increase frequencies. Much of the tube upgrades in recent years was to enable this, Thameslink will do it in the central section and TfL are now looking at it for London Overground.

No mention at all of using this with Southeastern.

Staffing

It mentions that passengers desire more staff at night but then does little to suggest it. TfL wanted to staff most stations from first to last train to improve safety and staff barriers to increase revenue before Grayling blocked it.

There’s also mention that passengers see themselves as being part of a “wider London transport system” with interchanges between DLR and tubes. But again, little mention of stopping those rip-off additional fees that Southeastern passengers have to pay to switch modes of transport that London Overground, Great Western, c2c etc. rail users avoid as they are on TfL fare schemes.

I’m extremely cynical about this. The Department for Transport have done very little for this franchise area, and particularly London suburban and metro services, going back over 10 years.

Now add Chris Grayling to the mix as Transport Minister and will we see those things that TfL provide on lines they took over? Whitehall have shown time and again they do not understand local need that authorities such as the Greater London Authority, the Mayor and TfL do.

Then add in a Treasury and Chancellors that continue to hit transport with huge cuts despite a rapid population increase in London and vast numbers of new builds (with Greenwich borough at the forefront of both) and it’ll take a big fight to get any sort of improvement.

Once again, give your comments at this survey here.

 

 

 